In December 2009 Kalmar Construction was appointed as the Main Contractor for the construction work on this project.
The work involved heavy excavation and drainage, formwork, reinforcing, concrete (3,500m3), structural steel (1,100 tonnes), roofing and cladding with an emphasis on accuracy of work, tight timeframes, and Health and Safety, all delivered on time.
"Kalmar are to be commended for their straightforward and transparent approach to all commercial issues. Although the project was run on a fast track program, the selection of sub-contractors was carefully considered, the pricing was keen and the variations were well managed". Robert Walker, AK4 Project Manager, ACI Operations NZ Limited.